Instructions for use
- Before commencing the works to be carried out, check the surface of the base. A solid and dust-proof base surface is required.
- Mix the contents of a bag with 2-3 litres of water (the desired consistency can be adjusted by adding water) twice for 5 minutes. The general rules of laying concrete must be observed when applying the ready-mixed material.
- The prepared and applied Estrich concrete must always be protected against high and low temperatures during the initial bonding phase.